Concord Police Department

Official News Blog

  • Home
  • About Us
  • Chief of Police
  • Contact Us
    • Contact Us
    • Public Records
  • Links
    • Concord Police Department Website
    • Crime Tip Line
    • Records and Forms
    • Police Logs
    • Firearms Licensing
    • Domestic Violence Services Network, Inc.
    • Communities for Restorative Justice
    • Drugs and Sharps 24 Hour Drop-Off
    • CodeRed Emergency Notification System

 

  • Email
  • Facebook
  • Twitter

Traffic/Construction Advisory: Walden St.

July 22, 2021 by concordmapdcaptain

Please be advised that National Grid and its Subcontractors will be performing a localized gas main replacement inside the roadway on Walden Street between the intersection of Concord Turnpike (Route 2) and Walden street to the Town Line of Lincoln and Concord starting Monday, July 26, 2021 and continuing for several months. Work will be performed between the hours of 8:00 pm and 4:00 am. Work entails trenching, gas main installation with patching, milling/grinding of existing asphalt and overlaying with new asphalt to repair the roadway. Alternating traffic will be maintained, however, expect localized delays near construction crews.  Additional information can be obtained by contacting National Grid 781-296-2096 or CPW- Engineering Division 978-318-3210.

Filed Under: News Blog

Archives

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Copyright © 2026 Concord, MA Police Department · Site Design by JGPR · Log in